This week our host Gareth McGlynn, sits down with the master of Integrated Estimating, Brent Pilgrim, National Director of Preconstruction at The Beck Group.
The discussion is about the following:
- What is Model-Based Estimating in the A/E/C industry?
- How Integrated Estimating is the future.
- The 5 key steps within Integrated Estimating.
- Preconstruction & Estimating: Transforming a broken, inefficient industry into something that is integrated, mechanized, and modern
- What is "Integrated Estimating" and why is Brent transforming the preconstruction discipline and the industry?
- The importance of cross-training and exposing yourself to MEP
- The Digital Link (key step within Integrated Estimating)
- What the next 20/30 years will look like for the Preconstruction & Estimating world - AI, Integrated Estimating and the labor shortage
Brent is a Preconstruction Technology enthusiast and is changing the industry for the better, but more importantly, doing it in an open and collaborative way.
Check him out on LinkedIn: https://www.linkedin.com/in/brentpilgrim/
Enjoy, and I love feedback - Hit me up on LinkedIn: https://www.linkedin.com/in/garethmcglynnEnjoy and subscribe please :-)
Accelerate your Preconstruction Career while earning a competitive salary with a Top Ranked ENR General Contractor
Apply for Construction Estimator JobsWe work with the Top 10% of Preconstruction Talent across the United States and can deliver this talent to you in 4-6 weeks
Post a job